HOME » What Documents Should a SATCOM Antenna Supplier Provide?

What Documents Should a SATCOM Antenna Supplier Provide?

What Documents Should a SATCOM Antenna Supplier Provide?

A SATCOM antenna supplier should provide a datasheet and drawings for the exact configuration ordered, measured radio-frequency (RF) test reports with calibration records, a certificate of conformity, installation and maintenance manuals, a packing list, and written warranty terms. If you specify a factory acceptance test (FAT), agree on the procedure before ordering and request the signed report before shipment. Site acceptance records, material certificates, regulatory and operator evidence, and customs paperwork depend on the project.

SATCOM Antenna Supplier Document Checklist

Use these 12 checklist items in your request for quotation. Agree on which apply, who supplies them, and which must be accepted before shipment or site handover.

DocumentWhen to request itWhat to verify
Datasheet and drawingsBefore orderingModel, feed, transmit and receive bands, mount, and drawing revision
Measured gain and pattern reportReview representative data before ordering; collect agreed reports before shipmentTested configuration, frequencies, polarization, and measured plots
Return-loss or VSWR plots and isolation dataBefore shipmentFull operating bands, measurement reference plane, and port pairs for isolation where applicable
Test method and calibration recordsWith the RF reportsInstrument IDs, calibration status at test time, and uncertainty where needed for acceptance
Factory acceptance procedure and signed reportIf specified, agree on the procedure before ordering; review the report before releasePass criteria, results, test dates, unit serial numbers, and sign-off
Commissioning procedure and site acceptance test (SAT) recordProcedure before installation; signed record at handover, if specifiedCompleted site checks, exceptions, and any required as-built records
Supplier certificate of conformityBefore shipmentPurchase order, serial or lot identifiers, and applicable specifications or revisions
Material and finish recordsBefore shipment, if specifiedStructural material, coating or galvanizing records, and fastener grades
Regulatory and operator evidenceConfirm scope before ordering and collect before filing or network approval, as applicableApplicable rule or standard edition, configuration covered, and status of any approval
Installation, operation, and maintenance manualsBefore installation; update at handover if the configuration changesSafety instructions, assembly, grounding, controller version, and spare parts
Packing and shipping documentsBefore dispatchCrate IDs, contents, weights, dimensions, and customs documents for cross-border shipments
Written warrantyBefore orderingStart date or event, duration, coverage, exclusions, and return freight responsibility

Datasheet and Installation Drawings

Ask for drawings tied to the quoted model, feed, and mount. Check the datasheet for transmit and receive bands, polarization, interface types, and the conditions attached to power ratings. Check the drawings for mounting dimensions, cable access, and clearance through the full range of motion where applicable. If you are comparing fixed and portable models in the SATCOM antenna product range, request the drawing for each mount under consideration rather than relying on a family brochure.

RF Test Reports and Calibration

Request measured gain and radiation-pattern data, including co-polar and cross-polar cuts where required. Ask which pattern envelope the supplier used. ITU-R S.580-6 describes radiation patterns as design objectives for earth-station antennas operating with geostationary satellites; it is not a test report or an approval for the antenna you ordered.[1]

Request swept return-loss or voltage standing wave ratio (VSWR) plots across the specified transmit and receive bands, rather than a reading at the center frequency. Where relevant, ask for port-to-port isolation data for dual-polarization or multiband feeds. Check where the measurement was taken, such as at the feed input. If insertion loss is quoted, ask whether the value is guaranteed or typical and under what conditions it applies.

Ask for the test setup, instrument IDs, and calibration certificates or a summary tied to those instruments. Where measurement uncertainty affects acceptance, agree on how it will be reported and used. NIST notes that traceability alone does not establish whether a measurement is fit for its intended use.[2]

Example of Checking an RF Report Against an Order

Suppose the packing list and FAT report identify the correct antenna, but the attached pattern plot is labeled for a different feed. Matching serial numbers on the shipment paperwork do not resolve that mismatch. Ask the supplier to show why the representative test applies to the ordered feed or to provide the correct report. If the purchase order requires a unit-specific pattern test, keep that item open until you receive the report for the shipped unit.

Factory Acceptance and Site Handover

Agree on which checks must be performed on each unit and which may be supported by representative type tests. Before authorizing shipment, review the signed FAT report against the agreed limits and ask for the test data and disposition of any failures. For tracking antennas, agree on applicable site checks such as travel limits and pointing or tracking verification. A blank SAT form defines what to check; the signed record documents what was actually checked after installation. If a separate installer performs the SAT, assign responsibility for returning the signed record before work starts.

Get the matching installation manual before work begins. For controller-equipped antennas, ask for the software version, backup and restore instructions, and alarm definitions. Update the handover set with final settings, drawing revisions, and as-built photos if the contract calls for them.

Conformity, Licensing, and Operator Evidence

Ask for a supplier certificate of conformity that identifies the order and the specifications it covers. ISO 9000 concerns quality management; a quality-management certificate does not replace the conformity record for your shipment.[3] Whether you buy a small flyaway terminal or a large earth-station antenna, trace the hardware to the order. For a large fixed installation, specify any material and finish records your structural reviewer needs.

For a U.S. earth-station filing, ask which parts of the supplier test package address the applicable provisions of 47 CFR Part 25, including antenna performance verification or standards where relevant.[4] For European projects, have the supplier identify the applicable edition of any ETSI earth-station standard it cites.[5] If the equipment is within the scope of the EU Radio Equipment Directive, ask for the applicable conformity documentation.[6]

If the satellite operator requires a separate approval, ask for its letter or reference number and check that the scope covers the antenna, feed, band, and any controller version specified in the approval. A pending approval is not a release to operate. Confirm with your licensing lead and network operator what evidence they will accept before relying on it.

Shipping Papers and Warranty Terms

Match crate IDs and any listed serial numbers to the shipment records. For a cross-border order, request the commercial invoice and agree with your customs broker on the origin and classification information needed for the shipment. The World Customs Organization tracks implementation of the Harmonized System; confirm the tariff line against the destination’s current schedule.[7] Agree separately on when the warranty starts, who handles claims, and who pays freight for warranty returns.

What to Do When a Document Is Missing

Record the missing item, name who will supply it, and set a due date. If the purchase order makes that document a condition of shipment, keep the release on hold until the requirement is met or an authorized reviewer accepts a documented alternative. An outstanding site record belongs on the handover list, not on the factory release checklist.

Preparing a SATCOM antenna quote request?

Send your band, mount, and site requirements to discuss which documents to include in the order.

Request a document review