HOME » Can I get a termination that survives a 5-minute overload?

Can I get a termination that survives a 5-minute overload?

Yes. Choose an RF termination whose continuous-wave (CW) rating covers the fault power with margin under your operating conditions. If the fault exceeds that rating, get written approval for the exact 300-second event, including how often it can recur and how long the load must cool between events. Air or water cooling can make a design suitable, but neither replaces a model-specific power rating.

What five minutes means for the load

At a constant 500 W of absorbed power, the termination takes in 150 kJ over 300 seconds (energy = absorbed power × time). That is energy absorbed over the event, not heat stored in the load at the end. The cooling system removes heat while the load is operating, so the energy calculation alone cannot tell you the temperature the load will reach.

Energy absorbed over 300 seconds at constant power
Absorbed RF power Calculated energy
50 W 15 kJ
100 W 30 kJ
500 W 150 kJ
1,000 W 300 kJ
3,000 W 900 kJ

For a pulsed signal, check average power for heating and verify peak power separately against the pulse width, repetition rate and duty cycle. A catalog peak rating does not cover five minutes at that power. RF breakdown is a separate failure mode from overheating; NASA’s JPL test facility, for example, distinguishes multipaction in vacuum from gas ionization at low pressure. [1]

For example, rectangular pulses at 2 kW peak and 10% duty cycle, with no power between pulses, average 200 W over a steady pulse train. A load that can dissipate 200 W continuously still needs a separate rating for those 2 kW pulses. Specify pulse width and repetition rate as well as duty cycle: different pulse trains can have the same average power.

How mismatch changes the power at the input

State whether the fault power is incident at the load input or absorbed by the termination. A voltage standing-wave ratio (VSWR) of 1.50:1 corresponds to a reflection coefficient magnitude of 0.20, so 4% of the incident power is reflected at that reference plane. A purely resistive 75-ohm load on an ideal 50-ohm line gives the same result: (75 − 50) / (75 + 50) = 0.20. [2]

Return loss expresses the same relationship as 10 log10(incident power / reflected power). At 1.50:1, that is 14.0 dB. [3]

Calculated reflection and return loss at the load input
Input VSWR Incident power reflected Return loss
1.03:1 0.02% 36.6 dB
1.15:1 0.49% 23.1 dB
1.40:1 2.78% 15.6 dB
1.50:1 4.00% 14.0 dB

These are calculated values, not measurements of a specific load. NIST’s direct-comparison power calibration method measures the relevant reflection coefficients with a calibrated vector network analyzer. [4] For a purchase, agree on the maximum input VSWR across your band and where it will be verified.

Here is how to use the table: at 500 W incident and a constant 1.50:1 VSWR, 20 W is reflected at the load input. For a load with no other RF output, the remaining 480 W is absorbed, or 144 kJ in 300 seconds at those conditions. Give the supplier the full 500 W incident and the VSWR limit, not just the 480 W heat-load estimate. Ask whether the reflected power is acceptable to the equipment upstream.

Shortlisting a coaxial load for a 500 W fault

Suppose your transmitter can deliver 500 W continuously for 300 seconds at 2.45 GHz into a 50-ohm, N-type termination. The coaxial termination catalog gives three distinct screening results:

  • DH-180CL100N1: DC to 18 GHz covers the frequency, but the 100 W average rating falls short. The 5 kW peak figure does not change that.
  • DH-010CL5000N: The 5,000 W average rating exceeds the required power, but the DC-to-1 GHz range excludes 2.45 GHz.
  • DH-040CL1000N: The catalog lists 1,000 W average, DC to 4 GHz and an N-type option. That makes it a candidate, not a confirmed fit. Ask whether the exact N-type configuration covers 500 W of incident power at 2.45 GHz with your ambient temperature, mounting and cooling conditions.

The same check applies to waveguide. On the air-cooled waveguide termination chart, the DH-100WHPL row lists WR90 at 8.2–12.5 GHz and 100–3,000 W CW; the DH-14WHPL row lists WR650 at 1.13–1.73 GHz and 1,000–4,000 W CW. Match the waveguide and flange first, then confirm the rating for the selected configuration. A matching flange on a 5 W or 10 W precision double-ridged termination is not a substitute for the required power rating.

When to ask for a 300-second rating or water cooling

If a standard load covers the fault under its applicable CW rating, document the exact configuration and any derating. If it does not, ask about a custom high-power termination with a written time-limited rating. Give the supplier the normal operating power before the fault, not just the fault power: a load already running warm does not start under the same conditions as a cold load. Ask for the allowable starting conditions, repeat limit, minimum cool-down time and the test or analysis supporting the rating.

Check the power allowed in your enclosure

Use the supplier’s derating data for the air temperature and airflow at the load, not the room temperature. Suppose the catalog lists 1,000 W CW, but the supplier allows only 450 W of incident power in your cabinet. A 500 W incident fault is outside that CW rating. Ask for a separate 300-second rating or choose a configuration with enough capacity under the actual conditions. The 450 W figure is illustrative, not a derating value for the shortlisted model.

If the installation cannot provide the required airflow, compare the water-cooled waveguide load range. A 3 kW, 300-second event is not automatically a water-cooled application. The choice depends on the selected load and its installation. For a microwave water load, confirm the coolant, minimum flow, maximum inlet temperature and what happens if flow is interrupted.

Specify what happens between faults

Suppose a 500 W fault lasts five minutes and can start every ten minutes. If the load returns to 100 W between faults, it gets five minutes at 100 W between events, not ten minutes of cooling with the RF off. A one-time rating from a cold start does not answer that request. Give the supplier the shortest start-to-start interval and the power between events. If your controls cannot enforce the agreed interval or end the fault in 300 seconds, do not rely on a rating that requires those limits.

What to put in the request for a quote

  • The operating band, exact connector or waveguide flange and, for coaxial loads, the system impedance.
  • Normal operating power, fault power at the load input, the 300-second duration, expected repetitions and available cool-down time. Include peak power, pulse width, repetition rate and duty cycle if applicable.
  • Ambient temperature, mounting orientation and clearance, available airflow or coolant conditions, and the maximum allowable input VSWR.
  • The required evidence: a datasheet or order confirmation for the exact configuration, plus any agreed acceptance checks. If the load must remain in service after the event, specify what it must still meet, such as an input VSWR limit after cool-down.

The Dolph Microwave inquiry page also asks for quantity and delivery date. Include the model number if you already have a candidate.

What should the load still do after the overload?

Decide whether the load only needs to withstand one fault before inspection and possible replacement, or must return to normal service. For a reusable load, put the post-event acceptance limit in the order. For example, if your system requires input VSWR no higher than 1.50:1 across its band, ask for that check before and after the agreed overload sequence. State whether the load must meet the limit immediately or only after a specified cool-down. That limit is an example, not a universal pass criterion.

Ask what the supplier’s evidence actually covers. A room-temperature VSWR sweep checks the match; it does not prove that the load can withstand a five-minute hot-start event. If you require a witnessed test or a test report, agree whether it covers a representative unit or the one you will receive, and make sure it states the applied power, frequency, duration, cooling and start conditions.

Can a 100 W termination take 200 W for five minutes?

Not on the strength of its 100 W rating alone. Select a load with a CW rating that covers 200 W under your conditions, or get a written 200 W, 300-second rating for the exact load and starting conditions. The 60 kJ that would be absorbed at a constant 200 W is a heat-load estimate, not proof that the termination survives.

Send your operating band, fault power, cooling conditions and repeat interval to confirm which termination rating covers your application.

Request a termination review from Dolph Microwave